CY126F 65W Low Noise High Quality New Centrifugal Heater Fan
- $37.00 / 1 - 99 sets
$35.00 / >=100 sets - 1 set
- Dongguan Sayu Electronic Equipment Co., Ltd.
- Guangdong, China
- Ms Caroline qiu
color: | Black | Origin: | Guangdong, China |
Applicable industries: | Hotels, Clothing Stores, Building Materials Stores, Manufacturing Plants, Machinery Repair Shops, Food and Beverage Plants, Farms, Restaurants, Home Use, Retail, Food Stores, Printing Shops, Construction, Energy and Mining, Food and Beverage Stores, Other, Advertising company | Packaging Details: | Carton or pallet packaging, centrifugal fan |
strength: | 65w, 65W | Supply capacity: | 3000 pieces per month |
After-sales service provided: | online support | port: | Shenzhen |
brand: | shark | Certification: | ce |
Customization support: | OEM production | current: | 0.55A |
type: | other | Install: | Detached |
Warranty: | 1 year | stage: | Simplex |
weight: | 4.5 kg | air flow: | 4.6/ CMM |
frequency: | 60/50 Hz | Blade material: | galvanized |
Voltage: | 110/220V | Rated voltage: | 110/220V |
payment terms: | L/C, Western Union, T/T, MoneyGram, Alipay or Wechat | pressure: | 38/3420 mm moisture/rpm |
FAQ
Q1. What service can you provide?
1) Focus on the air centrifugal fan industry for 15 years, can provide advanced technical support.
2) Professional service team, 24-hour service, so that you have no worries.
3) Sufficient stock can meet your immediate needs.
4) Up to 12 months of product quality assurance, you can use it with confidence.
5) The product has obtained 3C and CE certificates.
Q2. How do you guarantee the quality of your products?
We are a professional and unique manufacturer of blowers in Guangdong Province, China.
We have a complete set of production equipment and a complete QC testing system for the centrifugal fan industry.
Q3. In order to recommend suitable products to you, please help to confirm the following information:
1) Application of centrifugal fan
2) Technical parameter requirements
3) Order Quantity
4) Special product requirements, such as changing the outlet direction, special voltage requirements, etc.
fourth quarter: What is your payment terms?
By T/T, LC, 40% deposit in advance, balance 60% before shipment.
Q5: How to place an order?
First sign the PI, pay the deposit, then we arrange the production. You need to pay the balance after the production is completed. Finally we will ship.
Q6: When can I get the quotation?
We usually give you a quotation within 24 hours of receiving your inquiry. If you need a quotation urgently. Please call us or tell us in your mail so that we will regard your inquiry priority.