China New Product Jl-To-22 Tubular Heating Element for Toaster Oven Heating Element
- $2.50 / 5 - 99 pieces
$2.20 / 100 - 999 pieces
$2.00 / >=1000 pieces - 5 pieces
- Foshan Jinlan Heating Appliance Co., Ltd.
- Guangdong, China
- Mr Patrick Huang
PRODUCT DETAIL
usage: | heating | color: | image display |
Health status: | new | Component name: | Heating element |
port: | Yantian | brand: | Jinlan |
application: | hotel, home | Dimensions (L*W*H): | customer request |
Supply capacity: | 250000 pieces per month | pack: | carton |
Voltage: | custom made | Origin: | Guangdong, China |
type: | toaster parts | model: | Jl-To-22 |
Packaging Details: | strong carton | Energy source: | electricity |
payment terms: | L/C, D/P, D/P, T/T | Package preview: | |
Warranty: | 1 year, 1 year | After-sales service provided: | Return and exchange, overseas call center |
Applicable industries: | industrial heating |
Product Code | JL-WM-11 |
pipe | Stainless steel |
energy source | electrical |
Voltage | custom made |
electrical | 1 year |
Watts | custom made |
Q: What is the advantage of your factory?
A:1),We are a professional manufacturer with complete production and quality control lines.
A:1),We are a professional manufacturer with complete production and quality control lines.
2). Our location is very good, close to the airport (Guangzhou) and seaport (Shenzhen, Nansha), within 120 kilometers.
Q: How to guarantee the quality?
A:One is authorization certificate, we have ISO, CQC, CE, ROHS, BEAB. The other is strict production control, for example, 100% inspection will be done during production and before shipment.
Q: Are your products customized?
A:Yes, we do OEM production and supply new products according to your requirements or drawings.
Q: How long can you ship my order?
A:Production lead time is usually within 10-15 working days. Your order will be shipped by sea, train and air.
Q: Can my logo be marked on the product?
A:Yes. We provide OEM and ODM services. Your own logo (ladder) will be marked on the product.
Q: How to guarantee the quality?
A:One is authorization certificate, we have ISO, CQC, CE, ROHS, BEAB. The other is strict production control, for example, 100% inspection will be done during production and before shipment.
Q: Are your products customized?
A:Yes, we do OEM production and supply new products according to your requirements or drawings.
Q: How long can you ship my order?
A:Production lead time is usually within 10-15 working days. Your order will be shipped by sea, train and air.
Q: Can my logo be marked on the product?
A:Yes. We provide OEM and ODM services. Your own logo (ladder) will be marked on the product.
VIEW MORE