DIN ST37 small diameter high pressure fuel injection thick steel pipe
- $1.20 /kilogram
- 1 kilogram
- Changzhou Drake International Trade Co., Ltd.
- Jiangsu, China
- Ms Joanna Zhou
technology: | cold drawn | Steel pipe length: | customer request |
Special tube: | thick wall tube | Steel pipe material: | DIN St37 |
standard: | ASTM, ASTM A106-2006, ASTM A53-2007, ASTM A179-1990, ANSI A213M-2001, DIN, DIN 1629/3, DIN 2391, DIN 17175, DIN EN 10305, GB, GB/T 8163-1999, GB/ T 8162-1999, GB/T 3639-2000, GB/T8162, Gb/T8163, GB/T3639, JIS, JIS G3445-2006 | Alloy or not: | Unalloyed |
Steel pipe surface: | polished, galvanized | Origin: | Jiangsu, China |
Steel Tube Tolerance: | +/-0.03mm | Packaging Details: | 1. Wrapped in waterproof paper 2. Multiple steel bars in linen 3. Cap 4. Wooden box |
Yield strength of steel pipe: | ≥235 (MPa) | port: | Shanghai, Ningbo, Qingdao, Dalian, Tianjin, etc. |
thickness: | 0.5 - 8mm | payment terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram, paypal |
Steel pipe shape: | round | Supply capacity: | 800 tons per month |
Outer diameter: | 3 - 80 mm | Surface treatment: | polished, galvanized |
Section shape: | round | Steel pipe tensile strength: | ≥315 (MPa) |
Steel pipe technology: | Cold drawn and rolled | Middle school or not: | non-secondary school |
grade: | 10#-45#,10#,20#,45#,16mn,16mn,A53-A369,A213,Cr-Mo alloy,35CRMO4,30CrMo,Q195-Q345,Q235,Q345,Q195,ST35-ST52,ST37, ST52, ST45, ST35, ST37.4 | Certification: | ISO9001:2008 |
Steel pipe color: | silver | application: | Drill pipe, fluid pipe, hydraulic pipe, oil pipe, structural pipe |
free japanese tube your cum tubefree japanese tube your cum tubefree japanese tube your cum tubefree japanese tube you tube
free japanese tube your cum tubefree japanese tube your cum tubefree japanese tube your cum tubefree japanese tube you tube
free japanese tube your cum tubefree japanese tube your cum tubefree japanese tube your cum tubefree japanese tube you tube
DIN St37
chemical composition(%) | Mechanical behavior | |||||||||
C | silicon | manganese | small | P | chromium | you | copper | mo | Yield Strength | tensile strength |
( σs ) | ( σb ) | |||||||||
0.07~0.17 | 0.15~0.35 | 0.40~0.70 | ≤0.025 | ≤0.025 | ≤0.15 | ≤0.25 | ≤0.25 | / | ≥235 (MPa) | ≥315 |
(MPa) | ||||||||||
end shape | Beveled end, flat end, disappear, or add plastic cover to protect both ends according to customer requirements | |||||||||
surface | Oiled, galvanized, phosphated, etc. | |||||||||
treat | ||||||||||
technology | cold drawn | |||||||||
application | 1. Automobile and mechanical pipes | |||||||||
2. Petroleum cracking pipe | ||||||||||
3. High pressure boiler tube | ||||||||||
4. Low and medium pressure fluid delivery pipelines | ||||||||||
5. Fertilizer equipment pipes | ||||||||||
6. Heat exchange tube | ||||||||||
deliver goods | 1. BK (+C) | No heat treatment is performed after the last cold forming process. | ||||||||
situation | 2. BKW (+LC) | Light finishing (cold drawing) after final heat treatment | ||||||||
3. BKS (+SR) | After the final cold forming process, the tube is stress relieved annealed. | |||||||||
4. GBK (+A) | After the final cold forming process, the tube is annealed in a controlled atmosphere. | |||||||||
5. NBK (+N) | After the final cold forming process, the tube is annealed above the upper transformation point in a controlled atmosphere. | |||||||||
pack | 1. Bundled packaging. | |||||||||
2. Flat end or disappear according to customer requirements. | ||||||||||
3. Wrap with waterproof paper. | ||||||||||
4. The linen belt has several steel belts. | ||||||||||
5. Packed in a heavy three-wall box. |
free japanese tube your cum tubefree japanese tube your cum tubefree japanese tube your cum tubefree japanese tube you tube
free japanese tube your cum tubefree japanese tube your cum tubefree japanese tube your cum tubefree japanese tube you tube
free japanese tube your cum tubefree japanese tube your cum tubefree japanese tube your cum tubefree japanese tube you tube
free japanese tube your cum tubefree japanese tube your cum tubefree japanese tube your cum tubefree japanese tube you tube
free japanese tube your cum tubefree japanese tube your cum tubefree japanese tube your cum tubefree japanese tube you tube
free japanese tube your cum tubefree japanese tube your cum tubefree japanese tube your cum tubefree japanese tube you tube
free japanese tube your cum tubefree japanese tube your cum tubefree japanese tube your cum tubefree japanese tube you tube
1 | |
Are you a trading company or a manufacturer? | |
Yes, we are manufacturer. We have our own manufacturer - Changzhou Chengqi Steel Pipe Factory. | |
Changzhou Drake International Trade Co., Ltd. is our own export trading platform. | |
URL: www.cqsteelpipe.com/ | |
http://chengqisteelpipe.cn.alibaba.com/ | |
2 | |
How can I get the price? | |
We usually quote within 24 hours after we get your inquiry, tell us the material, outer diameter, | |
The wall thickness length, quantity and application of the steel pipe you need. if you are | |
Need the price urgently, please inform us by email so that we can regard your inquiry priority. | |
3 | |
How can I get a sample to check your quality? | |
After price confirmation, you can require for samples to check our quality. | |
We will provide you samples for free, but we can only ensure the same material, | |
Dimensions will be very similar but not identical to your request. Customers should be able to afford | |
freight. | |
4 | |
How long can I expect to get the sample? | |
Samples will be sent to you by express and arrive within 3-5 days. | |
You can use your own consignee account, or prepay us if you don't have an account. | |
5 | |
What about the lead time for mass production? | |
Honestly, it depends on the order quantity and the season you place the order. | |
6 | |
What is the small batch processing fee. | |
This is the payment for customers whose order quantity is less than the minimum order quantity. because the quantity is small | |
Products should be handled in large quantities in the production process and the average cost will be | |
Much taller than the big ones. So there is a small processing fee to guarantee our profit | |
Factory, usually the amount is about $250.00 | |
7 | |
Can the pipeline be customized for us? | |
Yes. We are a professional manufacturer with rich experience in precision seamless steel pipes | |
Pipeline manufacturing. | |
If you need OEM products, we can print logo and labels according to your requirements. besides, | |
We still do some fine workmanship, such as CNC cutting, chamfering, galvanizing and tapping, if you | |
There are detailed specifications or drawings. Our production lead time is within 30-45 days. | |
8 | |
What are your terms of delivery? | |
We accept EXW, FOB, CIF, DDU, etc. You can choose the most convenient or cheapest one | |
works for you. | |
9 | |
shipping | |
European countries: 22-28 days, | |
United States: East - 13-16 days, West - 21-28 days | |
Brazil: 30-40 days | |
Russia: 36 days | |
Japan: 3 days | |
Please advise your port when making an inquiry and a quote will be made specifically for you |
Free Japanese Tube You TubeFree Japanese Tube You Tubefree japanese tube you tubefree japanese tube you tube
Aluminum channel tube Aluminum channel tube Aluminum channel tube Aluminum channel tube Aluminum channel tube Aluminum channel tube Aluminum channel tube Aluminum channel tube