Economic and Efficient china factory direct sale plastic parts boxes With Best Service
- $0.50 / >=100 sets
- 100 sets
- Shanghai Reder Industrial Supply Co., Ltd.
- Shanghai, China
- Ms Tammy Tan
Model Number: | ETT003; | Product Keywords: | china factory direct sale plastic parts boxes; |
Supply Ability: | 5000 Sets per Month; | Packing: | Carton; |
Certificate: | ISO9001; | Payment Terms: | T/T; |
Brand Name: | REDER; | Delivery Detail: | 30 days after payment; |
Port: | Shanghai Port; | Condition: | New; |
Load capacity: | 15kg; | Plastic: | Other; |
Color: | Yellow/blur/red; | Place of Origin: | Shanghai, China; |
Packaging Detail: | Carton; |
Economic and Efficient china factory direct sale plastic parts boxes With Best Service
parts box with all size
Name | Hanged parts box with all size |
Material | 100% New PP |
Load Capacity | 10 KG |
Outside Dimensions | 200*340*155 mm |
Customized Color | Accept |
Customized Logo | Accept |
Stack | Accept |
Package | Standard export carton box or according to customer requirements |
Warranty | One year |
Sample | Charge |
2017 new industrial work benches
Steel Roller Tool Cabinet /rolling tool cabinet
24 drawers file cabinet/documents cabinet
75 drawers parts storage with door
Shanghai Reder Industrial Supply Co., Ltd., since our establishment in 2001, has been dedicated in designing, developing, manufacturing, and selling the storage, logistic and industrial machinery. Now with the headquarter in Shanghai, we have already set up our branch offices all over China in succession.
As one of the most professional storage and logistic manufacturer in China, our specialized team for designing and manufacturing is made up of the experienced engineers who are have devoted themselves to designing and manufacturing the logistic machinery for many years, which is also the most important reason to keep our products ahead in technology and manufacture process. we have always firstly considered the customer's demand, keeping absorbing the advanced domestic and foreign technology and concept of the logistic planning and management.With the propose of helping the customers promote efficiency, reduce the cost, create profit, and the, philosophy of safety, high efficiency and humanization, the usage of the advanced production equipment, we have developed many series products of the work place tool chests, the industrial handling facilities, the storage machineries, and the logistic containers.
PACKAGE:
one piece packed in one carton
DELIVERY TIME:
After receiving your deposit,we uaually need 7-10 working days for 20GP container,and 20-25 days for 40HQ
1.Experienced staff answer all your reply&questions in fluent English within 24 hours.
2.Sample available upon request.
3.Professional knock-down design cabinet,newest design.
4.All parts 100% Antirust technology,Anti-tilt mechanism.
5.Special discount and protection of sales area provided to our distributor.
6.Strict-Quality Control during each procedure in production.
7.A team of designers and engineers are capable to create new items according to personal request.
8.Direct sales by the manufacturer, which shortens the distance between the factory and consumers.
9.Type Steel locker, steel wardrobe, filing cabinet, drawer-file cabinet, mobile pedestal, tambour& shutter cupboard, office table, bookcase etc.
10.Multiple Production line and Teams, Offering you speedier delivery and dedicated craftmans to make furniture according to your requirements.
11.We will offer you suggestions and options in material and designs to help you lower tooling costs.
1.What is the payment term?
We accept T/T, L/C,Western Union,Secure Payment,etc.
2.How can i install?
The installation drawing is incude in packing, we can also show you the installation video.
3.Can you accept OEM or ODM?
Yes,the customized furniture is always welcone here.Any style we can customize,OEM and ODM for you.
4.What is your best price?
We hope to enlarge our business and markets,and want to cooperate with clients with long terms.So,our prices are fabulous.
5.When will you delivery goods?
After receiving your deposit,we uaually need 7-10 working days for 20GP container,and 20-25 days for 40HQ.