Factory supplies high purity custom graphite heating elements for furnaces

  • $20.00 / 10 - 99 pieces
    $15.00 / 100 - 199 pieces
    $10.00 / 200 - 399 pieces
    $5.00 / >=400 pieces
  • 10 pieces
  • Huixian City Mishan Graphite Jip Co., Ltd.
  • Henan, China
  • Ms Zora Lou
PRODUCT DETAIL
Resistance (μΩ.m):7-8μΩmapplication:vacuum furnace
port:Qingdaobrand:Mishan
Size and shape:Custom processingSupply capacity:500,000 pieces per month
port:Qingdao/Tianjin/Shanghaitechnology:sintering mold
Bulk density (g/cm3):1.75-1.85g/cubic centimeterpack:wooden box
Minimum order quantity:50Porosity(%):13~14μm
product name:graphite heating elementPlace of origin:Henan, China (Mainland)
payment terms:L/C, Western Union, D/P, D/A, T/T, MoneyGramPackage preview:
color:Blackdensity:1.75-1.85g/cubic centimeter
Ash content:0.09%Packaging details:Graphite heating elements are packed in wooden boxes or crates, or according to customer requirements.
model:MS#HE002Key words:Graphite sintering mold
Compressive strength:65-135MpaMaterial:High purity graphite material
Product Description

Factory supplies high purity custom graphite heating elements for furnaces

Advantages of graphite:
good chemical resistance
Good self-lubricating properties
Special thermal shock resistance
good electrical conductivity
High mechanical strength and easy to process

Product Details

product name High temperature resistant graphite heating element
brand Mishan
Bulk density 1.68~1.91g/cubic centimeter
Breaking strength 38~60Mpa
Compressive strength 65~135Mpa
Ash content 500PPM
Minimum order quantity 10
Key words High density graphite heating element, graphite heating element price, customized graphite heater

Our graphite products are widely used in lightning protection, heat treatment, superhard materials, bearings, non-ferrous metals
Metal casting, EDM, electronic semiconductors, mechanical seals, photovoltaics, glass and ceramics,
Automobile, carbon brush and other industries.

Packaging and shipping

pack:
Single crate or wooden box or according to customer requirements.

delivery time:
3-20 days after confirming the order, the specific delivery date should be based on
Production season and order quantity.

VIEW MORE