Famous Prefabricated High Rise Steel Structure Frame Apartment Hotel Building
- $77.00 / 500 - 1999 square meters
$70.00 / 2000 - 3999 square meters
$60.00 / >=4000 square meters - 500 square meters
- Shandong Chentai Steel Structure Co., Ltd.
- Shandong, China
- Ms Winnie Zhang
Material: | Q355, ASTM A572 Gr.50, S355JR; | Package Preview: | ; |
Connection: | High strength bolt connection; | STANDARD: | ASTM, BS, EU, Australian, Russian; |
Model Number: | BY-Apartment-003; | Design: | PKPM, 3D Tekla drawing ,SAP2000; |
After-sale Service: | Online technical support,Onsite Installation,Onsite Training,Onsite Inspection,Return and Replacement; | Cladding materials: | AAC board, cement board, sandwich panel; |
Advantage: | HIgh strength, quick building, anti earthquake; | Certificate: | CE, ISO, SGS,BV,Lioyd's; |
Place of Origin: | Shandong, China; | Payment Terms: | T/T; |
Type: | Light and heavy; | Packaging Detail: | Steel structures are packed well with steel pallets then loaded into containers.; |
Production System: | Automatic welding,assembling,cutting machines; | Project Solution Capability: | graphic design,3D model design,total solution for projects,Cross Categories Consolidation; |
Main Structure: | Box column, H steel, Tubular structure; | Brand Name: | BY Steel Building; |
Supply Ability: | 6500 Metric Tons per Month; | Warranty: | More than 5 years; |
Port: | Qingdao port; |
BY STEEL STRUCTURE GROUP---China Steel Structure Expert
One-stop Service: Designing,Fabrication,and Installation.
Standard: American ,BS ,Australian, and EU standard
Certification: ISO,CE,Lloyd's,SGS,BV.
Our products have been export to over 55 countries. Such as USA,Mexico,Qatar, Saudi Arabic, Oman, Kazakhstan, Mongolia,Russian,Gemany, France,UK, South American, Romania, Bulgalia,Japan,South Korea, Australia, Middle east, South African, Ghana, Kenya, Indonesia, Philippines, Maldives and so on.
Our products:steel structural warehouse building, workshop building, Agricultural building (Horse/cattle barn, poultry house), high rise steel building, heavy industrial steel structure building, car parking, steel structure aircraft hanger, school, office building, prefab house, container house, truss roof warehouses, sandwich panel, corrugated steel sheet, C&Z section steel purlin.
We can also supply different kind of doors and windows, cranes which is related to project.
Equipment and Professional Production Line:
6 sets of production lines for welded H beam , annual output is 60000 tons
2 sets of production lines for C section steel , yearly output is 5000 tons
2 set of production lines for Z section steel, annual output is 5000 tons.
25 sets of production lines for Color coated corrugated steel sheets, annual output is 8000 tons.
3 sets of production lines for sandwich panels, annual capacity is 1200000 M2.
2 sets of CNC plane drilling machines.
Packing: It will be packed into carton or bundled for the big beam and column will leave it as it is. Or packed the parts to the big pallet and push into the containers.
Shipping: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.
Pre-Sales Service | 1. Consultant service (Answering client's questions) 2. Primary design plan(Free) 3. Assisting client to choose suitable construction plan 4. Price calculation 5. Business&technology discussion |
Sale Service | 1. Submission of support reaction data for foundation 2. Submission of construction drawing 3. Providing requirements for embedding 4. Construction Manual 5. Fabrication & Packing 6. Statistical table of material 7. Delivery on time 8. Other requirements by Clients |
After-Sale Service | 1. Service of installation Supervision 2. Instruction for using after installation completed |
Q1: Can I have a visit to your factory before the order?
A: Why not? welcome to visit our factory. You can fly to Qingdao Airport.We will pick you up in the airport. Hotel booking service is available
Q2: Do you supply installation service?
A: Yes,we do. Our workers and engineers could be sent to the construction site for installation help. The daily salary, accommodation cost, flight cost, food fee will be paid by the BUYER.
Q3: How long can the space frame be used?
A: The use life of the main structure is the designed used life, that is 50-100 years (standard request of GB).
Q4: How long is the use life of roof cover?
A: The use life of PE coating is usually 10-25 years. The use life of roof day-lighting panel is shorter, usually 8-15 years.
Q5: What is the anti-rust treatment for steel structure?
A: Anti-rust treatment of steel structure
Normal anti-rust paint
Anti-rust paint with epoxy zinc primer
Hot-dip galvanization
Hot-dip galvanization+PU finish
Powder coating.
Stainless steel structure: No.301/304/316 stainless steel structure.
Q6:How do we cooperate on certatin project?
Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal on alibaba.com with Trade Assurance.
Project details ---> Drawings for your project ---> Revised drawings ---> Transaction confirmation with Trade Assurance
Q7:What is the delivery time?
Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.
Other Products
-
8-story apartment high-rise steel structure building$60.00 - $77.00 / square meter
-
Low cost Pre-engineering design prefab steel structure building office building$66.00 - $77.00 / square meter