High quality factory supply household fresh food refrigerator freezer household refrigerator BCD-118

PRODUCT DETAIL
Material:plasticCertification:ce
port:Zhongshan Port/Shenzhen Port/Guangzhou PortShelf Refrigerator Compartments:3 glass shelves
brand:ODM/OEMDoor:Double door
place of origin; place of origin:Guangdong, ChinaDefrost Type:Manual, manual defrost
type:top freezerApplication Control:Do not
feature:compressorEnergy source:electrical
Cooling type:direct coolingapplication:Home, Garage, Hotel, Commercial
Install:portableEnergy efficiency rating:Third grade
Voltage (V):220-240Packaging Details:Standard export packaging
temperature:0-10℃/-18℃Model:BCD-118
Refrigerator capacity:80LWarranty:1 year
Interior lights:YesHealth status:new
Packaging Materials:Foam board + cartonDimensions (L x W x H (inches):450*505*1160mm
payment terms:wire transferThe refrigerant:R600a
temperature control:MechanicalSupply capacity:30000 pieces per month
Power/Current:90W/0.4AAfter-sales service provided:Free spare parts
Packaging Preview:Freezing capacity:38L
Power (W):90
Thermal refrigeration equipment refrigerator house double door fresh refrigerator BCD-118
1. International famous brand compressor
Q1: How do we guarantee the quality?
Always pre-production samples before mass production; Always final inspection before shipment;

Q2: What is your payment term?
The payment methods we accept are: T/T, Paypal, Western Union, Money Gram, LC, Trade Assurance. Sample orders should be paid in full. T/T: 30% TT should be made as a deposit in advance, and then the balance should be paid before shipment.

Q3: Can you provide samples?
We can provide you with samples. Sample time is approximately 15 days. The sample fee is XXX USD/PC (not including shipping. If you place an order of more than 100 pieces, it is refundable after bulk order).

Q4: What is your MOQ?
The MOQ for our normal price is 20ft container. We also accept smaller quantity orders. But the price will be slightly higher due to the increased material cost for small batches.

Q5: Can you support customization?
Of course, OEM and ODM are also accepted.

Q6: What is your production lead time and delivery conditions?
Usually, the production time is about 35 days after receiving the advance payment. And only accept FOB and EXW. The port is Guangzhou or
Shenzhen.

Q7: What certificate do you have?
We have many certificates in over 70 countries. We have CE, CB, DOE, ETL, IEC, SASO certificates.
VIEW MORE