Metal Pipe End Forming Machine Solutions
- $2700.00 /set
- 1 set
- BOBO Machine Co., Ltd.
- Jiangsu, China
- Mr Sotu Zhu
PRODUCT DETAIL
Core components: | motor | Mechanical test report: | if |
Name: | Tube End Forming Solutions | Applicable industries: | manufacturing plant |
brand: | boo boo | Main selling point: | multifunctional |
place of origin; place of origin: | Jiangsu, China | Health status: | new |
Type of machine: | Tube end forming machine | Power (kW): | 5 |
Single package size: | 1X1X1 cm | Extra Services: | Welding/Brazing, Machining, Polishing/Polishing, Grooving and Grooving, Piercing and Punching, Plating/Coating, Painting/Powder Coating, End Forming, Swaging, Heat Treating, Cut to Length |
Maximum shrinkage capacity (thickness) (mm): | 10000 mm | Core Components Warranty: | 1 year |
Gross weight per piece: | 1.000 kg | Weight (kg): | 1500 |
Material/Metal Finishing: | Brass/Copper, PVC, Alloy, Stainless Steel, Plastic, Aluminum, Aluminum Alloy, Carbon Steel | Packaging Details: | wooden cage |
Raw materials: | Sheet/Platform Rolling, Tube, Reinforcement | Sales unit: | single product |
Showroom location: | not any | Video external inspection: | if |
automation: | automatic/manual/semi-automatic | Maximum shrinkage capacity (diameter) (mm): | 10000 mm |
Warranty: | 1 year | Marketing Type: | New Products 2020 |
Product Description
Metal Pipe End Forming Machine Solutions
Specification
1 |
1. Q: What is the power supply of the machine?
A: The standard power supply in China is 380V, 3P, 50Hz. We can also customize accordingly.
2. Q: What information do customers need to provide to get an accurate quote from us?
A: Customers need to provide relevant technical requirements, drawings, pictures, industrial voltage, planned output, etc.
3. Q: What is the payment term A: The payment term is 30% down payment, 70% before shipment (T/T mode), we also accept other
Payment terms, such as L/C, DA, D/P, etc.
4. Q: What is the delivery time?
A: Usually the delivery time of the machine is 30 days after receiving the deposit.
5. Q: How long is the warranty period of the machine?
A: The warranty period is one year from the date of the bill of lading.
A: The standard power supply in China is 380V, 3P, 50Hz. We can also customize accordingly.
2. Q: What information do customers need to provide to get an accurate quote from us?
A: Customers need to provide relevant technical requirements, drawings, pictures, industrial voltage, planned output, etc.
3. Q: What is the payment term A: The payment term is 30% down payment, 70% before shipment (T/T mode), we also accept other
Payment terms, such as L/C, DA, D/P, etc.
4. Q: What is the delivery time?
A: Usually the delivery time of the machine is 30 days after receiving the deposit.
5. Q: How long is the warranty period of the machine?
A: The warranty period is one year from the date of the bill of lading.
VIEW MORE
YOU MAY LIKE