Motorcycle Engine Alloy Water Cooling Pump, High Quality Replacement Part Water Pumps
- $30.00 / 100 - 299 sets
$20.00 / >=300 sets - 100 sets
- Autotop Industry Co., Ltd.
- Shanghai, China
- Ms Lyon Lee
Type: | Water Pump; | Port: | Shanghai / Ningbo; |
Brand Name: | Autotop; | Place of Origin: | Shanghai, China; |
OEM: | Avaliable; | Quality: | A-Class; |
Intended Use: | Replacement Part; | Warranty: | 1 Year; |
Packing: | Carton; | Packaging Detail: | Standard export carton / as customer's requirements; |
Color: | Silver; | Material: | Alloy; |
Product Name: | Water Pump Assy; | Payment Terms: | L/C,D/P,D/A,T/T; |
Package: | 1x Complete Water Pump Set; | Supply Ability: | 20000 Sets per Month; |
Packing Size: | 21x14x12 cm; |
Motorcycle Engine Alloy Water Cooling Pump, High Quality Replacement Part Water Pumps For YAMAHA Majesty 250 00/03
Specifications
1.Supply to USA, Europe, Austrilia and so on
2.Matrial:Alloy
3.Professional Perfomance Auto parts supplier
4.For Motorcycle Engines
Engine Water Cooling Pump
Material: Steel
Suit For: Motorcycle Engine
Customized: Avaliable
Plastic Injection Crankshaft
Material: Steel with Plastic Injection
Suit For: Motorcycle Engine
Customized: Avaliable
High Flow Air Filter
Material: Import Filter Paper
Suit For: Motorcycle Engine
Customized: Avaliable
1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 6 hours.
4. After sending, we will track the products for you once every two days until you get the products. When you got the goods, test them, and give us a feedback.If you have any questions about the problem, contact with us, we will offer the solve way for you.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 45 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Please click the link below and send us your inquiry.
I will repiy immediately !