High quality multi-model folding electric scaffolding lift folding electric scaffolding
- $120.00 / 2 - 98 sets
$90.00 / 99 - 398 sets
$80.00 / >=399 sets - 2 sets
- SHANG RAO HOUXINZCH WEB TECH., LTD
- Jiangxi, China
- Mr Conrad Yang
PRODUCT DETAIL
type: | Portal, scaffolding | After-sales service: | Online technical support, on-site installation, on-site training, on-site inspection |
port: | Shanghai | Package preview: | |
Supply capacity: | 3000 pieces per week | size: | Customer's |
Place of origin: | Jiangxi, China | Key words: | metal scaffolding frame |
Variety: | Inclined ladder wide frame | usage: | Site construction |
Warranty: | 1 year | product name: | Electric lifting scaffolding |
application: | outdoor | Stair material: | Aluminum alloy |
design style: | industrial | payment terms: | L/C, Western Union, D/P, D/A, T/T, MoneyGram |
Project solution capabilities: | Overall project solution | color: | Customized colors |
Advantage: | stable | Packaging details: | Shipping standard packaging or customer requirements |
brand: | off-road, off-road |
Product style
Product Details
Variety | Electric scaffolding | usage | Site construction | |
brand | X road | |||
Stair material | Aluminum alloy | |||
type | Gate type |
Company Profile
Our factory
FAQ
1. How to get a quote and place an order?
We will design and then quote accurately. Send us your dimensions and requirements (or send your plans).
2. How long does it take for customers to receive the goods?
In addition to the above production time, shipping to any destination port around the world usually takes 10-15 days.
3. When can it be shipped after placing the order?
Depending on the product, it may be 30 days to 40 days, the exact delivery time will be specified in the proforma invoice after order confirmation.
4. How is your after-sales service?
We always provide relevant technical support to solve any problems occurring in our furniture with quick response, all your inquiries will be replied within 24 hours.
5. Can you help me install it?
We don't have overseas installers but we can discuss and find ways to support you. Free installation guide provided.
We will design and then quote accurately. Send us your dimensions and requirements (or send your plans).
2. How long does it take for customers to receive the goods?
In addition to the above production time, shipping to any destination port around the world usually takes 10-15 days.
3. When can it be shipped after placing the order?
Depending on the product, it may be 30 days to 40 days, the exact delivery time will be specified in the proforma invoice after order confirmation.
4. How is your after-sales service?
We always provide relevant technical support to solve any problems occurring in our furniture with quick response, all your inquiries will be replied within 24 hours.
5. Can you help me install it?
We don't have overseas installers but we can discuss and find ways to support you. Free installation guide provided.
contact us
VIEW MORE
YOU MAY LIKE
Other Products
-
Construction electric lifting scaffolding, which can be lifted 2-8 meters and can bear 500kg$260.00 - $320.00 / piece