Rowal cheap mig-200 igbt inverter argon maquinas de solder mig

  • $275.00 / 100 - 999 pieces
    $245.00 / >=1000 pieces
  • 100 pieces
  • Lewei Pumps Industry Co., Ltd.
  • Zhejiang, China
  • Mr SUN LIPENG
PRODUCT DETAIL
Showroom location:not anyAfter warranty service:Video technical support, online support, spare parts
Nominal Duty Cycle (MIG) at 40°C:60%Health status:new
port:FOB Ningbo portNominal Duty Cycle (%):250A@60%
color:custom madeApplicable industries:Hotel, home furnishing, construction engineering, advertising company
aspect:650*330*530mmRated output current (MIG):250A
usage:MIG MAG weldingMechanical test report:if
Weight (kg):34 kgWarranty:1 year
technology:IGBT inverter weldingproduct name:Inverter DC MIG welding machine
Supply capacity:3000 pieces per dayLocal service location:not any
payment terms:L/C, T/TMarketing Type:2019 Hot Products
Rated output voltage (MIG):24 voltsFunction:MIG MAG MMA arc welding
Wire feeding speed:24 m/minmaximum. Load power capacity:11.72KVA
Name:Luo Hua Chinastrength:6.4KVA
brand:LowellVoltage:220V-380v
After-sales service provided:Engineers available to service machinery overseasCertification:EU ROHS
Rated input voltage:26 voltsPackaging Details:Packing details: standard carton, or wooden case for large machines
place of origin; place of origin:Zhejiang, ChinaVideo shipment inspection:if
weight:31 kgMain selling points:easy to operate
No-load voltage:70 voltsFuse Type:spray transfer
Material/Metal Processing:Carbon steel
 
Product Description

 MIG/MAG/MMA inverter welding machine with separate wire feeder

Product Description

Single-phase, portable, air-cooled, constant temperature protection, mobile welding cable

It adopts advanced IGBT inverter technology, is light in weight and complies with EMC standards.

20-50khz power inverter platform to ensure arc self-regulation performance.

Precise control of current waveform, excellent C02 arc welding performance

Precise and unified adjustment, easy operation

Compact, portable, efficient, low power consumption, energy saving

Strong compensation ability, anti-voltage fluctuation, stable welding current

Simple manual arc welding, suitable for on-site operation.

Available for MIG/MAG and MMA

 

Packaging and Shipping

Packaging and Shipping

Packing details: standard carton, or wooden case for large machines

Delivery time and port: 30-40 days/FOB Ningbo port or Shanghai port

 

Product Image                                                                                                                                         

 

company information

 

Founded in 1990, Zhejiang Lewei Pump Industry Co., Ltd. is located in Daxi, the hometown of China's pump industry. It is adjacent to National Highway 104 and the air port. The transportation is very convenient.
Our company is a professional manufacturer and exporter of water pumps and electric welding machines, with import and export rights
We have a professional design, production and sales team. Complete equipment: advanced equipment such as production lines, CNC machine tools, machining centers, and testing centers are in sync with international standards. With all kinds of goods, passed ISO9001 and CE certification, we are researching, developing and constantly innovating new products. We have established export trade relations with many countries, and the goods are sold to the Middle East, Southeast Asia, Europe, Africa, South America, etc. Our goal: excellent quality, warm service to new and old customers. run to the world

touch

 

 

 

FAQ

 

1) How can I place an order?
A: You can contact us by email for your order details, or place an order online.

2) How can I pay you?
A: After you confirm our PI, we will ask you to pay. T/T (HSBC) and Paypal, Western Union are our most commonly used ways.

3) What is the ordering procedure?
A: First we discuss order details, production details by email or TM. Then we send you a PI for your confirmation. You will be required to pay full payment or deposit in advance before we go into production. After receiving the deposit, we start to process the order. If we don't have stock, we usually need 7-15 days. Before production is finished, we will contact you for shipment details and balance payment. After the payment is completed, we start to prepare the shipment for you.

4) How do you deal with when your customers receive defective products?
a substitute. If there are some defective items, we usually credit our customers or replace them on the next shipment.

5) How do you check all the goods on the production line?
A: We have on-site inspection and finished product inspection. When the goods enter the next step of production procedure, we will check the goods.

 

 

our service

 

A: Your inquiry about our products or prices will be replied within 24 hours.
B: Protect your sales area, design ideas and all your private information.
C: Best quality and competitive price.

VIEW MORE