hot and cold water dispenser with refrigerated cabinet Compress water dispenser drink water fountain

PRODUCT DETAIL
Function:Hot Water Cold Water;Place of Origin:Zhejiang China;
Package Preview:;Power Source:Electric;
Warranty:1 Year;Payment Terms:L/C,D/A,D/P,T/T,Western Union,MoneyGram;
Style:Floor Standing;Supply Ability:450 Piece/Pieces per Day;
Heating capacity:5L/h 85-95;Keywords:compress Drinking Water Dispenser;
Certification:CB,ce;Material:ABS Material;
Color:gold;Application:Household Drinking Water Filtration,Hotel,Commercial,Household;
Dimensions (L x W x H (Inches):34*34*102cm;After-sales Service Provided:Free spare parts;
Cooling power:90W;Voltage (V):220;
Port:NINGBO;Installation:Stand;
Model Number:AFK-368;Power (W):550;
Product name:Water Dispener;Packaging Detail:standard cardboard box with foam;
Brand Name:AOFUK;Type:Hot & Cold;
Housing Material:Plastic;Cooling capacity:1.5L/h 5--10;
Product Description
Product Name
Water dispenser
Model
AFK-368
Brand
AOFUK
Colour
Gold
Type
Hot & Cold
Cabinet
refrigerator
Cooling Method
Compressor Cooling
packing dimension
34*34*102cm
rated voltage
220-240V / 110-127V
Weight(N/GW)
18/19KGS
frequence
50/60Hz
Housing Material
Plastic&Metal
cooling power
90w
heating power
550W
cooling capacity
1.5L/H (5-10℃)
Heating capacity
5.0L/H (85-95℃)
packing 
 cartons
Place of Product
Zhejiang Province,China

 Materials
All The Plastic Parts Are Made Of Anti-Bacteria ABS
Style
stand
Cooling Method
Lateral Plate(Metal ) Is Cool Rolled Steel
packing dimension
34*34*102cm
rated voltage
Stainless Steel Welding Water Tank And Copper Tube Ring Cold Tank
Weight(N/GW)
18/19KGS
FAQ
Q1: What is the production time?
A1: 25-30 days after deposit received.

Q2: Can I put my own Logo on machine?
A2: Yes, we are specializing in OEM order. Logo, carton design, color are all can be customizable.

Q3: What's your payment term?
A3: We usually accpet T/T as the main payment term,and other payments can also be negotiated.

Q4: What's the delivery time ?
A4: It's OEM ,so usually takes about 7-15 working days to produce the products.

Q5:What about the lead time for mass production ?
A5 : Honestly ,it depends on the order quantity and your specific requirements of products.


VIEW MORE